18-632
| 1 | | | public hearing report | August 15, 2018 - Planning Board Minutes | | |
Not available
|
Not available
|
18-598
| 1 | 5A. | | consent report | T.F. Bernier, Inc, on behalf of Harold E. and Judith Ekstrom, requesting Major Site Plan approval to construct a new 4-story building for 38 apartments, and associated site improvements at 56-64 Warren St., 32-36 N. Spring St., and 17-19 & 21 Green St. in the Civic Performance (CVP) and Downtown Residential (RD) Districts. | | |
Not available
|
Not available
|
18-606
| 1 | 6A. | | public hearing report | Petrogas Group New England, Inc, requesting ADR approval to replace an internally illuminated panel in an existing freestanding sign at 417 S. Main Street in the General Commercial (GC) District. | | |
Not available
|
Not available
|
18-607
| 1 | 6B. | | report | Blueprint Recovery Center, on behalf of ZJBV Properties, LLC, requesting ADR approval to replace a panel in an existing freestanding sign and install a new wall sign at 2 Chenell Drive in the Office Park Performance (OFP) District. | | |
Not available
|
Not available
|
18-608
| 1 | 6C. | | report | Lothstein Guerriero PLLC, requesting ADR approval to install a new externally illuminated freestanding sign at 5 Green Street in the Central Business Performance (CBP) District. | | |
Not available
|
Not available
|
18-582
| 1 | 6D. | | public hearing report | Spirit Halloween, on behalf of TRU 2005, RE LLC, requesting ADR approval to replace a panel in an existing freestanding sign and install a new wall sign at 310 Loudon Road in the Gateway Performance District (GWP). | | |
Not available
|
Not available
|
18-609
| 1 | 6E. | | public hearing report | Hannaford, on behalf of City Plaza Concord LLC, requesting ADR approval to install six (6) new internally illuminated wall signs at 73 Fort Eddy Road in the Gateway Performance District (GWP). | | |
Not available
|
Not available
|
18-610
| 1 | 6F. | | public hearing report | Altitude Trampoline Park, on behalf of Steeplegate Mall Realty LLC, requesting ADR approval to install a new internally illuminated wall sign at 270 Loudon Road in the Gateway Performance District (GWP). | | |
Not available
|
Not available
|
18-617
| 1 | 6G. | | public hearing report | Roy Nails, on behalf of Michael J. Montore Revocable Trust, requesting ADR approval for installation of new window signs at 94 Storrs Street in the Central Business Performance (CBP) District. | | |
Not available
|
Not available
|
18-611
| 1 | 7A. | | public hearing report | The Hotel Concord requesting ADR approval to install a new internally illuminated wall sign at 11 S. Main Street in the Central Business Performance (CBP) District. | | |
Not available
|
Not available
|
18-623
| 1 | 7B. | | consent report | Warrenstreet Architects requesting ADR approval on behalf of Bangor Savings Bank, to replace the façade of the building at 76-82 N. Main Street in the Central Business Performance (CBP) District. | | |
Not available
|
Not available
|
18-594
| 1 | 8A. | | public hearing report | Richard D. Bartlett & Associates, on behalf of Joan L. Laramie and Alexander Feldvebel & Marie Dalterio, requesting Minor Subdivision approval for a 7,000 sf lot line adjustment between 86 and 90 Rockingham Street in the Medium Density Residential (RM) District. | | |
Not available
|
Not available
|
18-599
| 1 | 8B. | | public hearing report | MHF Design Consultants on behalf of Irving Oil Properties, requesting Major Site Plan approval for construction of a convenience store, fueling station, and related site improvements; and three Conditional Use Permits to allow a fueling station in the CU District, to allow two driveways on a frontage where only one is permitted, and to allow less than the required separation between driveways at 22 & 24 Penacook Street and 163 N. State Street in the Urban Commercial and Urban Transitional Districts. | | |
Not available
|
Not available
|
18-596
| 1 | 8C. | | public hearing report | SFC Engineering Partnership, Inc, on behalf of Rymes Propane & Oil, Inc, requesting Major Site Plan approval for construction of a new parking lot at 257 Sheep Davis Road in the Gateway Performance (GWP) District. | | |
Not available
|
Not available
|
18-597
| 1 | 8D. | | public hearing report | T.F. Bernier, Inc, on behalf of Harold E. and Judith Ekstrom, requesting Comprehensive Development Plan approval and Minor Subdivision approval for the lot consolidation and lot line adjustment between properties at 56-64 Warren St., 32-36 N. Spring St., and 17-19 & 21 Green St. in the Civic Performance (CVP) and Downtown Residential (RD) Districts. | | |
Not available
|
Not available
|
18-400
| 1 | 8E. | | public hearing report | Nobis Engineering, on behalf of Smokestack Realty, requesting Major Site Plan approval to construct a new access road and parking areas totaling approximately 22,000 sf of new impervious area at 254 N. State Street in the Institutional (IS) District. | | |
Not available
|
Not available
|
18-625
| 1 | 9A. | | public hearing report | Main Street Design Guide final draft proposed for adoption by the Planning Board | | |
Not available
|
Not available
|
18-626
| 1 | 10. | | report | CodeNEXT - Review of Character Analysis | | |
Not available
|
Not available
|
18-633
| 1 | | | public hearing report | September 11, 2018 - Architectural Design Review Committee Minutes | | |
Not available
|
Not available
|