23-0382
| 1 | | | consent report | July 19th, 2023 Planning Board Minutes | | |
Not available
|
Not available
|
|
23-0372
| 1 | 5A. | | public hearing report | Wilcox & Barton, Inc, on behalf of First Church Holdings, LLC, request Major Site Plan approval for the conversion of a church into 30 residential units and related site improvements, and a Conditional Use Permit (CUP) to allow alternative parking at 177 N. Main Street in the Urban Commercial (CU) District. (2023-122) | | |
Not available
|
Not available
|
|
23-0375
| 1 | 6A. | | consent report | Classic Signs requests ADR approval for a new 36 sf internally illuminated wall sign at 8 Merchants Way in the Gateway Performance (GWP) District. This sign received a variance to allow 76 sf of building signage where 45 sf is allowed. | | |
Not available
|
Not available
|
|
23-0378
| 1 | 6B. | | consent report | SAR Concord, on behalf of Sugar River Bank, requests ADR approval for a new 1.625 sf non-illuminated sign at 150 North Main Street in the Central Business Performance (CBP) District. | | |
Not available
|
Not available
|
|
23-0380
| 1 | 6C. | | consent report | Spectrum Signs, on behalf of Playabowls NH, requests ADR approval for a new 53.3 sf internally illuminated wall sign at 70 Storrs Street in the Opportunity Corridor Performance (OCP) District. This sign received a variance to allow 69.8 sf where 21 sf is allowed. | | |
Not available
|
Not available
|
|
23-0376
| 1 | 7A. | | public hearing report | ReVision Energy and Horizons Engineering, Inc, on behalf of Breezeline, requests a Conditional Use Permit (CUP) for a ground mounted solar array for on-site use at 264-268 Sheep Davis Road in the Gateway Performance (GWP) and Open Space Residential (RO) Districts. (2023-121) | | |
Not available
|
Not available
|
|
23-0377
| 1 | 7B. | | public hearing report | Wilcox & Barton, Inc, on behalf of Havenwood Heritage Heights, requests Major Site Plan approval for construction of three new residential buildings and related site improvements, along with a Conditional Use Permit (CUP) for disturbance of a bluff buffer at 149 East Side Drive in the Medium Density (RM) District. (2023-120) | | |
Not available
|
Not available
|
|
23-0371
| 1 | 7C. | | public hearing report | Nobis Group, on behalf of Dakota Partners, requests Major Site Plan approval for construction of 3 new 3-story multifamily buildings totaling 98 units and related site improvements and a Conditional Use Permit (CUP) for construction of fewer parking spaces than is required at 103 Old Loudon Road in the Medium Density (RM) District. (2023-124) | | |
Not available
|
Not available
|
|
23-0379
| 1 | 7D. | | public hearing report | Keach Nordstrom, on behalf of James Palmisano, requests Major Site Plan approval for construction of a new 144 unit age restricted residential development consisting of three new 3-story multifamily buildings, a clubhouse, and related site improvements and a Conditional Use Permit (CUP) for disturbance of a wetland buffer at 33 Old Loudon Road in the Medium Density (RM) District. (2023-104) | | |
Not available
|
Not available
|
|
23-0391
| 1 | 8. | | public hearing report | Council referral regarding a request to discontinue a portion of the Stickney Avenue right-of-way. | | |
Not available
|
Not available
|
|
23-0385
| 1 | 10. | | consent report | Architectural Design Review Committee Member | | |
Not available
|
Not available
|
|
23-0373
| 1 | 11. | | public hearing report | T.F. Bernier, Inc, on behalf of Kevin Porter, requests Minor Subdivision approval for a 2-lot subdivision at 35 Reserve Place in the Open Space Residential (RO) Districts (2023-119). The applicant has requested to postpone to the September 20, 2023 meeting. | | |
Not available
|
Not available
|
|
23-0383
| 1 | 12. | | public hearing report | Eckman Engineering, on behalf of Continental Paving, requests a Conditional Use Permit (CUP) for disturbance of a wetland buffer at 320 Sheep Davis Road in the Gateway Performance (GWP) District. (2023-125) The Applicant has requested to be continued to the September 20, 2023 Planning Board meeting. | | |
Not available
|
Not available
|
|
23-0381
| 1 | Info 1 | | consent report | August 1st, 2023 Architectural Design Review Minutes | | |
Not available
|
Not available
|