File #: 20-1256    Version: 1 Name:
Type: consent resolution Status: Passed
File created: 10/19/2020 In control: City Council
On agenda: 12/14/2020 Final action: 12/14/2020
Title: Resolution repurposing the sum of $74,073.72 from the Washington Street Bridge Rehabilitation Design subproject (CIP #603) for use on the Washington Street Bridge Rehabilitation Construction subproject (CIP #603); together with report from the City Engineer.
Attachments: 1. Resolution, 2. Report

Title

Resolution repurposing the sum of $74,073.72 from the Washington Street Bridge Rehabilitation Design subproject (CIP #603) for use on the Washington Street Bridge Rehabilitation Construction subproject (CIP #603); together with report from the City Engineer.