Legislation Details

File #: 26-338    Version: 1 Name:
Type: public hearing report Status: Passed
File created: 7/24/2026 In control: Planning Board
On agenda: 8/19/2026 Final action: 8/19/2026
Title: Nobis Group, on behalf of The Stabile Group, Bow Mills United Methodist Church, Inc, and D. McLeod Inc, requests approval for a major subdivision application for a new 24-lot subdivision of an existing 10.7-acre parcel known as Tax Map 8814Z Lot 4, including the construction of an approximately 900-foot municipal roadway, proposed as a continuation of Mooreland Avenue, which will connect to an approximately 800-foot municipal extension of Heather Lane, and associated municipal and non-municipal infrastructure. The project also includes a lot line adjustment with the abutting property known as Tax Map 8814Z Lot 3, addressed as 271 South Street, in the Single Family Residential (RS) District. (2026-059) (PL-MAS-2026-0013) (Continued to September 16, 2026, at the request of the applicant)
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

Nobis Group, on behalf of The Stabile Group,  Bow Mills United Methodist Church, Inc, and D. McLeod Inc, requests approval for a major subdivision application for a new 24-lot subdivision of an existing 10.7-acre parcel known as Tax Map 8814Z Lot 4, including the construction of an approximately 900-foot municipal roadway, proposed as a continuation of Mooreland Avenue, which will connect to an approximately 800-foot municipal extension of Heather Lane, and associated municipal and non-municipal infrastructure. The project also includes a lot line adjustment with the abutting property known as Tax Map 8814Z Lot 3, addressed as 271 South Street, in the Single Family Residential (RS) District. (2026-059) (PL-MAS-2026-0013) (Continued to September 16, 2026, at the request of the applicant)